tP1 tP2 tP3 tP4





Core Link receives order from Crown Van Gelder Papierfabrieken, Netherlands



Core Link will upgrade the fully automatic core handling system from 1984 with new core cutter, control system, upgraded safety, electrical equipment and controls for existing hoppers and transport system. The upgraded system improves the availability, cutting accuracy and safety.
 
The system will be delivered as per September 2016.


« Back to News

P.O. Box 198 SE-311 22 Falkenberg, Sweden | Phone +46 346 568 00 | info@corelink.se